AllSheetsAllSheetsGuideGuideGuideGuide
✕

Getting started

  • What AllSheets is
  • Your first call sheet
  • The dashboard

The builder

  • Around the builder
  • Building the schedule
  • Tethering times
  • Cast, crew & clients
  • Locations & weather
  • Files & attachments

Sending & live links

  • Sending call sheets
  • Changing call times
  • What recipients see
  • Importing call sheets
  • Switching from another tool

Reference

  • Contacts & your team
  • The AllSheets Network
  • Preferences & defaults
  • Integrations
  • Plans, billing & seats
  • Refer a friend
  • Keyboard shortcuts & gestures
  • FAQ

The builder

Tethering times

Tie any set of times together so they always move as one.

Tethers tie times together across strips: lunch always ends when the afternoon block starts, a move always begins at camera wrap, three departments always flip at the same moment. Tethered times share one value and one color, and editing any of them moves the whole group.

It clicks the moment you do it once. Drag the glowing dot to tie Scene 7's end to Lunch, then drag the end time and watch Lunch follow:

Try it: tether two times

6:00 AM–Scene 7 - Rooftop
12:30 PMLunch

Drag the glowing green dot from Scene 7’s end onto Lunch’s start to tie them together. After that, moving one moves the other.

On desktop

  1. Look beside a strip's start and end times: each has a small faint link dot that brightens on hover (and takes its group's color once tethered).
  2. Drag the dot onto another strip's time. Dropping on the left half of the time cell ties to that strip's start, the right half to its end.
  3. The tethered times snap to one shared value and take the group's color.
  • Click a dot to pop that one time out of its group; the rest stay linked.
  • Shift-click a dot to dissolve the whole group at once.
  • Groups can hold more than two times. Drag more dots in and they inherit the group's color and value.

On phones

  1. Press and hold a strip's start or end time. A pill appears above it reading Tether to.
  2. Tap the pill. Candidate times across the schedule pulse.
  3. Tap the time you want to tie to. Done.

Hold an already-tethered time and the pill reads Untether instead.

How tethers interact with durations

A tether outranks a duration, unless the duration is frozen. Tether a strip's end to something and the end holds that shared time while the duration stretches to fit. With the duration frozen (red padlock), a lone tether moves the whole strip instead, keeping its length. On an unlocked strip, tethering both edges makes the duration the gap between them. A frozen strip won't take a second tether; unfreeze it first.

Tethers and Cascade

Tethered times ignore Cascade: editing one moves only its group. Change a tethered end and that strip gets longer or shorter; the strip whose start is tied to it follows, but its own end stays put, so it absorbs the change and the rest of the day holds. Freeze the duration of a tethered strip that should keep its length and it slides along instead. To push everything after it, select those strips and shift them together.

‹ Previous

Building the schedule

Next ›

Cast, crew & clients

Something here out of date or missing? Tell us: support@getallsheets.com